The High School project consists of renovations and infrastructure improvements to the High School Building as follows:

  • Tech/STEM Space Renovations: Full demolition of existing footprint and installation of new finishes, existing equipment, new equipment and all associated MEPFP infrastructure.
  • Building Control Upgrades: Full replacement and update to the Building Management System for MEPFP Controls.
  • Site improvements include installation of new concrete pad, fencing and infrastructure for a new Dust Collector to service the new Tech Space and some minor hardscapes work for a new Overhead Door entry point to the space.

Middle School

The Middle School project consists of major renovations, site work and infrastructure improvements to the Middle School Building as follows:

  • Site Improvements:
    1. Reconstruction of existing tennis courts for the conversion to a synthetic turf playing surface.
    2. Construction of a new play equipment area including new infrastructure and equipment for community and District use.
    3. Stormwater improvements/replacement of storm piping.
  • Emergency Service Updates: Renovations to include new EM lighting throughout, new gas shutoff valve replacements and additions and miscellaneous emergency power generation hookups.
  • Building Control Upgrades: Full replacement and update to the Building Management System for MEPFP Controls.
  • Boiler System Replacement: Full replacement of existing Boiler System and install of new system to include all equipment, Domestic Water systems, Controls, Pumps, etc.
  • Roof Replacement: Selective Roof replacements and repairs in various areas to achieve new 30-year and 20-year warranties.
  • Main Office A/C and Ceiling Replacement: Renovation of ceilings and lighting to accommodate full replacement of existing mechanical equipment and new equipment install to add air conditioning service to the Space. Scope includes some exterior sitework for new concrete pads, landscaping, etc. to accommodate new ground-mounted Condensing Units.

Elementary School

The Harold O. Brumsted Elementary School project consists of infrastructure improvements to the Elementary School Building as follows:

  • Building Control Upgrades: Full replacement and update to the Building Management System for MEPFP Controls.
A room at the high school currently being renovated
A room at the high school being renovated.
A room at the high school being renovated.
A room at the high school being renovated.
A room being renovated at the high school.

High School: Wood Floor & CMU Wall Demo

A room at the high school being renovated.

High School: Floor Infill

A steel structure being worked on at the high school.

High School: Steel Structure/Welding

Demolition occurring in a room at the high school.

High School: Miscellaneous Demolition

Control valves being installed.

High School & Elementary School: Control Valves

Athletic field reconstruction.

Work on the Athletic Field

High School: PP-C Panel Replacement

HS: PP-C Panel Replacement

Middle School: Sanitary Line Replacement

MS: Sanitary Line Replacement

High School: Exhaust Fan

HS: Exhaust Fan

Middle School: MH-1

MS: MH-1

High School: Pipes Rough In

HS: Pipes Rough In

High School & Elementary School: Control Valves

HS & ES: Control Valves

High School: Tech Room Above Ceiling Rough In

HS: Tech Room Above Ceiling Rough In

Middle School: Storm Pipe Lining

MS: Storm Pipe Lining

Middle School: Playground Installation

MS: Playground Installation

track render