The High School project consists of renovations and infrastructure improvements to the High School Building as follows:

  • Tech/STEM Space Renovations: Full demolition of existing footprint and installation of new finishes, existing equipment, new equipment and all associated MEPFP infrastructure.
  • Building Control Upgrades: Full replacement and update to the Building Management System for MEPFP Controls.
  • Site improvements include installation of new concrete pad, fencing and infrastructure for a new Dust Collector to service the new Tech Space and some minor hardscapes work for a new Overhead Door entry point to the space.

Middle School

The Middle School project consists of major renovations, site work and infrastructure improvements to the Middle School Building as follows:

  • Site Improvements:
    1. Reconstruction of existing tennis courts for the conversion to a synthetic turf playing surface.
    2. Construction of a new play equipment area including new infrastructure and equipment for community and District use.
    3. Stormwater improvements/replacement of storm piping.
  • Emergency Service Updates: Renovations to include new EM lighting throughout, new gas shutoff valve replacements and additions and miscellaneous emergency power generation hookups.
  • Building Control Upgrades: Full replacement and update to the Building Management System for MEPFP Controls.
  • Boiler System Replacement: Full replacement of existing Boiler System and install of new system to include all equipment, Domestic Water systems, Controls, Pumps, etc.
  • Roof Replacement: Selective Roof replacements and repairs in various areas to achieve new 30-year and 20-year warranties.
  • Main Office A/C and Ceiling Replacement: Renovation of ceilings and lighting to accommodate full replacement of existing mechanical equipment and new equipment install to add air conditioning service to the Space. Scope includes some exterior sitework for new concrete pads, landscaping, etc. to accommodate new ground-mounted Condensing Units.

Elementary School

The Harold O. Brumsted Elementary School project consists of infrastructure improvements to the Elementary School Building as follows:

  • Building Control Upgrades: Full replacement and update to the Building Management System for MEPFP Controls.
A room at the high school currently being renovated
A room at the high school being renovated.
A room at the high school being renovated.
A room at the high school being renovated.
A room being renovated at the high school.

High School: Wood Floor & CMU Wall Demo

A room at the high school being renovated.

High School: Floor Infill

A steel structure being worked on at the high school.

High School: Steel Structure/Welding

Demolition occurring in a room at the high school.

High School: Miscellaneous Demolition

Control valves being installed.

High School & Elementary School: Control Valves

Athletic field reconstruction.

Work on the Athletic Field

April 2026

High School: PP-C Panel Replacement

HS: PP-C Panel Replacement

Middle School: Sanitary Line Replacement

MS: Sanitary Line Replacement

High School: Exhaust Fan

HS: Exhaust Fan

Middle School: MH-1

MS: MH-1

High School: Pipes Rough In

HS: Pipes Rough In

High School & Elementary School: Control Valves

HS & ES: Control Valves

High School: Tech Room Above Ceiling Rough In

HS: Tech Room Above Ceiling Rough In

Middle School: Storm Pipe Lining

MS: Storm Pipe Lining

Middle School: Playground Installation

MS: Playground Installation

May 2026

Middle School Playground

MS: Playground Complete

Middle School Turf

MS: Turf Complete

Middle School Pool Filter/Valve

MS: Pool Filter/Valve Replacement

Middle School Boiler Room

MS: Boiler Room Abatement

High School Dust Collector Ductwork

HS: Dust Collector Ductwork

HVAC Control

HS, MS, & ES: Control Updates

High School Garage Bay

HS: Site Work

Roofing Curbs

HS: New Curbs

Middle School Pool Roof

MS: New Pool Roof

June 2026

Middle School Incinerator Abatement

MS: Incinerator Abatement

Middle School Basketball Court New Asphalt

MS: Basketball Court New Asphalt

Middle School Roof Work

MS: Roof Work

Middle School Boiler Room Demo

MS: Boiler Room Demo

High School Lawn Restoration

HS: Lawn Restoration

High School Drywall Tech Room

HS: Drywall Tech Room

High School Panel Wiring

HS: Panel Wiring

High School Dust Collector, RTU, MAU

HS: Dust Collector, RTU, MAU

High School RTU Control Upgrade

HS: RTU Control Upgrade

July 2026

Middle School Main Office ACCU

MS: Main Office ACCU

Middle School Corridor Lights

MS: Corridor Lights

Middle School Score Board

MS: Scoreboard

Middle School Boiler Room

MS: Boiler Room

Middle School New Building Boilers

MS: New Building Boilers

High School Woodshop Flooring Prep

HS: Wood Shop Flooring Prep

High School Computer Lab Floor

HS: Computer Lab Floor

High School Woodshop Paint and Floor

HS: Wood Shop Paint and Floor

High School Corridor Rebranding

HS: Corridor Rebranding

track render